Up to the top level directory | | / |
Go Back | | .. |
01. INTRODUCTION AND PROJECT OVERVIEW.FLV | 08/02/2013 | 8.21 MB |
02. STARTING ON THE PROXY MESH FOR THE INFILTRATOR.FLV | 08/02/2013 | 68.40 MB |
03. FINISHING THE PROXY CAGE.FLV | 08/02/2013 | 48.18 MB |
04. BEGINNING THE INFILTRATOR RIG AND CREATING THE MIDDLE LEG'S BONES.FLV | 08/02/2013 | 49.24 MB |
05. CREATING JOINT CHAINS FOR THE REST OF THE LEGS.FLV | 08/02/2013 | 62.25 MB |
06. BUILDING JOINTS FOR THE ARMS.FLV | 08/02/2013 | 55.03 MB |
07. CONNECTING IK HANDLES TO THE LIMBS AND PARENTING THE PROXY MESHES.FLV | 08/02/2013 | 64.22 MB |
08. STARTING ON THE REVOLVING LEG RIG.FLV | 08/02/2013 | 43.06 MB |
09. WORKING ON THE INFILTRATOR'S BODY RIG.FLV | 08/02/2013 | 14.11 MB |
10. LEG CONTROLS FOR THE INFILTRATOR.FLV | 08/02/2013 | 50.38 MB |
11. CREATING KNEE CONTROLS.FLV | 08/02/2013 | 73.58 MB |
12. SETTING UP THE INFILTRATOR'S ARM AND ELBOW CONTROLS.FLV | 08/02/2013 | 39.54 MB |
13. USING CUSTOM ATTRIBUTES FOR THE CLAWS.FLV | 08/02/2013 | 50.68 MB |
14. DYNAMICALLY PARENTING THE ARMS TO THE BODY.FLV | 08/02/2013 | 41.69 MB |
15. THE CENTER OF GRAVITY CONTROL.FLV | 08/02/2013 | 17.25 MB |
16. CREATING CONTROLS FOR THE REVOLVING LEGS.FLV | 08/02/2013 | 40.35 MB |
17. FINISHING THE REVOLVE CONTROLS FOR THE LEGS.FLV | 08/02/2013 | 29.66 MB |
18. ESTABLISHING A REVOLVE CONTROL FOR THE INFILTRATOR'S BODY.FLV | 08/02/2013 | 42.78 MB |
19. RIGGING THE HEAD.FLV | 08/02/2013 | 83.03 MB |
20. BEGINNING THE EYE RIG.FLV | 08/02/2013 | 50.76 MB |
21. FINALIZING THE EYE RIG.FLV | 08/02/2013 | 57.96 MB |
22. RIGGING THE NECK.FLV | 08/02/2013 | 44.99 MB |
23. USING DEFORMERS TO RIG THE HEAD FLEXOR.FLV | 08/02/2013 | 48.41 MB |
24. RIGGING THE PISTONS CONNECTED TO THE BACK SHELLS.FLV | 08/02/2013 | 54.26 MB |
25. CREATING CONTROLS FOR THE BACK SHELLS.FLV | 08/02/2013 | 63.66 MB |
26. COMPLETING THE SHELL RIG.FLV | 08/02/2013 | 56.32 MB |
27. AUTOMATING THE MOVEMENT OF THE FRONT SHELLS.FLV | 08/02/2013 | 40.83 MB |
28. ADDING AUTOMATED SUBTLETIES WITH SET DRIVEN KEYS.FLV | 08/02/2013 | 44.54 MB |
29. FINALIZING THE AUTOMATION OF THE FRONT SHELLS.FLV | 08/02/2013 | 30.68 MB |
30. BUILDING A GLOBAL CONTROL AND ORGANIZING THE SCENE.FLV | 08/02/2013 | 49.06 MB |
31. WORKING WITH CHARACTER SETS.FLV | 08/02/2013 | 16.93 MB |
32. TYING THE RENDER MESH OF THE INFILTRATOR INTO THE CONTROL RIG.FLV | 08/02/2013 | 65.64 MB |
33. FINALIZING THE INFILTRATOR CONTROL RIG.FLV | 08/02/2013 | 71.66 MB |