Up to the top level directory | | / |
Go Back | | .. |
01 - TITLE.AVI | 08/28/2012 | 1.65 MB |
02 - INTRODUCTION.AVI | 08/28/2012 | 21 MB |
03 - FITTING THE SLIDE TO THE FRAME.AVI | 08/28/2012 | 111.01 MB |
04 - POSITIONING THE SLIDE.AVI | 08/28/2012 | 56.10 MB |
05 - BARREL TYPES AND FITTING.AVI | 08/28/2012 | 205.58 MB |
06 - LOCK-UP.AVI | 08/28/2012 | 20.98 MB |
07 - CUTTING THE LUGS.AVI | 08/28/2012 | 50.27 MB |
08 - FITTING THE LINK.AVI | 08/28/2012 | 104.14 MB |
09 - REAMING THE BARREL.AVI | 08/28/2012 | 52.58 MB |
10 - RAMPING AND POLISHING THE BARREL.AVI | 08/28/2012 | 31.48 MB |
11 - INSTALLING A FULL LENGTH GUIDE ROD.AVI | 08/28/2012 | 37 MB |
12 - PENCIL TEST AND HANG TEST.AVI | 08/28/2012 | 24.12 MB |
13 - INSTALLING THE FIRING PIN & STOP.AVI | 08/28/2012 | 31.02 MB |
14 - TUNING THE EXTRACTOR.AVI | 08/28/2012 | 80.41 MB |
15 - INSTALLING THE EJECTOR.AVI | 08/28/2012 | 50.39 MB |
16 - INSTALLING THE PLUNGER TUBE.AVI | 08/28/2012 | 32 MB |
17 - INSTALLING THE GRIP SAFETY.AVI | 08/28/2012 | 29 MB |
18 - INSTALLING THE TRIGGER.AVI | 08/28/2012 | 60.99 MB |
19 - FITTING THE SAFETY.AVI | 08/28/2012 | 39 MB |
20 - THE TRIGGER JOB.AVI | 08/28/2012 | 14 MB |
21 - THE TRIGGER JOB (TRIGGER FIXTURES).AVI | 08/28/2012 | 7.01 MB |
22 - THE TRIGGER JOB (SEAR-TRIGGER RELATIONSHIP).AVI | 08/28/2012 | 23.82 MB |
23 - THE TRIGGER JOB (CONTINUED).AVI | 08/28/2012 | 206.21 MB |
24 - LUBRICATION.AVI | 08/28/2012 | 28 MB |
25 - FITTING THE SAFETIES.AVI | 08/28/2012 | 59 MB |
26 - INSTALLING THE STOCK SCREW BUSHINGS.AVI | 08/28/2012 | 59 MB |
27 - FINAL CONTOURING.AVI | 08/28/2012 | 34.01 MB |
28 - INSTALLING THE SIGHTS.AVI | 08/28/2012 | 86.99 MB |
29 - FINAL THOUGHTS.AVI | 08/28/2012 | 10.94 MB |
30 - MANUFACTURER'S INFORMATION.AVI | 08/28/2012 | 21.92 MB |