Personal Development Courses A/AGI - 1911 3 PACK/AGI 308 AND 309 - BUILDING THE ULTIMATE 1911 (1 OF 4)

Up to the top level directory /
Go Back ..
01 - TITLE.AVI08/28/20124.31 MB
02 - INTRODUCTION.AVI08/28/20123.01 MB
03 - CHOOSING CUSTOM FEATURES AND OPTIONS.AVI08/28/201243.99 MB
04 - RELIABILITY AND ACCURACY.AVI08/28/201259.22 MB
05 - TIGHTENING THE SLIDE.AVI08/28/201267.98 MB
06 - LAPPING THE FRAME AND SLIDE.AVI08/28/201237 MB
07 - INSTALLING A DROP-IN BARREL.AVI08/28/201283.98 MB
08 - INSTALLING A GUNSMITH-FIT BARREL.AVI08/28/2012172.95 MB
09 - FINAL BARREL FITTING.AVI08/28/201238.99 MB
10 - JARVIS CAMLOCK SYSTEM.AVI08/28/201215 MB
11 - FITTING THE EXTRACTOR.AVI08/28/201262.33 MB
12 - INSTALLING THE FIRING PIN.AVI08/28/201258.99 MB
13 - INSTALLING THE EJECTOR.AVI08/28/201251.80 MB
14 - INSTALLING THE EJECTOR (CONTINUED).AVI08/28/20129 MB
15 - REPLACING THE GUIDE ROD.AVI08/28/201232.99 MB
16 - INSTALLING THE GRIP SAFETY.AVI08/28/201277.98 MB
17 - INSTALLING-REPAIRING THE PLUNGER TUBE.AVI08/28/201242.99 MB
18 - FITTING THE SAFETY.AVI08/28/201242.99 MB
19 - MAINSPRING HOUSINGS & MAG WELLS.AVI08/28/201218 MB
20 - INSTALLING THE TRIGGER.AVI08/28/201239.99 MB
21 - FITTING THE GRIP SAFETY.AVI08/28/201216 MB
22 - THE TRIGGER JOB.AVI08/28/201290.98 MB
23 - LUBRICATION.AVI08/28/201227 MB
24 - INSTALLING THE MAGAZINE RELEASE.AVI08/28/20129 MB
25 - TRIGGER ADJUSTMENTS.AVI08/28/201221 MB
26 - FITTING THE SAFETY CAM.AVI08/28/201226.99 MB
27 - ADDITIONAL TIPS ON TRIGGER SYSTEMS.AVI08/28/201254.99 MB
28 - INSTALLING AND TIGHTENING SIGHTS.AVI08/28/201267.98 MB
29 - SERRATING THE SLIDE.AVI08/28/201232 MB
30 - FINAL CONTOURING.AVI08/28/201210 MB
31 - COMPLETED CONTOURING.AVI08/28/201223.99 MB
32 - METAL FINISHES.AVI08/28/201212 MB
33 - THE FINISHED PRODUCT.AVI08/28/201218 MB
34 - MORE INFORMATION ON MANUFACTURERS INCLUDED IN THIS VIDEO.AVI08/28/201213 MB

Total: 1.35 GB (1,453,907,968 Bytes) in: 34 File(s)